How to run a move-out inspection (with a checklist)
A practical, room-by-room move-out inspection process for Kenyan rentals — what to check, what to photograph, and how to turn findings into fair deposit decisions.
The RentPlus Team
5 June 2026 · 2 min read
A good move-out inspection takes forty-five minutes and prevents weeks of argument. Here's a process you can use this month, whatever tools you run on.
Before the day
- Schedule it with the tenant present. An inspection the tenant attended is an inspection the tenant accepts.
- Bring the move-in report. You are not assessing the unit; you are comparing it. No baseline? Do the best you can this time — and never skip a move-in inspection again.
- Confirm the unit is actually empty. Furniture hides damage. Inspect after the last box leaves.
The walk: room by room
Work in the same order every time so nothing gets skipped:
Every room
- Walls and ceilings — cracks, holes, unauthorised paint, mould
- Floors — chips, burns, stains, missing tiles
- Windows — glass, latches, screens, curtain rails
- Doors — locks, keys returned, handles, frames
- Electrical — every switch, socket and bulb actually tried
Kitchen
- Sink, taps and drainage (run the water)
- Worktops and cabinet doors, hinges and shelves
- Cooker point / gas fittings
Bathrooms
- Toilet flush, cistern and seat
- Shower head, taps, drainage (run them)
- Tile grout and silicone, mirror and fittings
Outside / common
- Balcony rails and floor
- Meters — photograph the readings
- Parking spot, storage, mailbox key
The three photo rule
For each fault: one wide shot placing it in the room, one close-up, one with a reference for scale (a hand, a coin). Photos that can't be located in the unit convince nobody.
Scoring, then costing
Score each item against the baseline — unchanged, wear-and-tear, or damage. Only damage gets costed, and only with a receipt or a written quote. Present the whole package to the tenant: comparison, photos, arithmetic, refund.
Doing this in RentPlus
RentPlus inspections turn this whole article into software: reusable templates so every walk is identical, scored items with photos attached in the moment, automatic pairing against the move-in baseline, and findings that convert straight into maintenance jobs for the make-ready. The deposit decision cites the evidence — and the next tenant's move-in inspection is already scheduled.